2024. In south London Built Narratives have prepared a design for a new sports pavilion and cafe to sit alongside a EV charging hub for a rapidly expanding EV client. The site sits within London Metropolitan Open Land and requires a sensitive and considered approach. All the existing site trees will be retained and new trees will be planted with the built layout informed by the tree constraints. The pavilion serves both the local sports pitch users and the EV drivers. Full planning will be submitted in early 2025, with construction targeted for second half of 2025.